This project consists of the boiler house refurbishment at North Cork Education Centre, Fermoy, Co. Cork including the removal of the existing oil fired boiler system and oil tank and the provision of 2no. wall hung boilers to serve the upper floors and 1no. to serve the basement area with both fed from
their own Board Gas meters, pipework, valves, pumps, headers, heat exchanger, insulation works and boiler house controls. The works also include the re-configuration of pipework to ensure that the basement heating system is separate from the upper floors.