The contractor will be required to remove the existing 20m of defective concrete/masonry wall supporting Laneside, Sawley Old Brow, Sawley from the River Ribble. The contractor will design, supply and install a 30m section of cantilevered sheet pile wall that will extend 5m either side of the defective area to support the permanent load case.